Skip to main content
European Commission logo
Clean energy for EU islands

Astypalea

Charging station in front of white houses on island

Island facts

Country
Exact population
1376
Exact density
12pop./km²
Exact surface dimensions
97km²
Interconnection
Local grid
Secretariat engagement

Based on 2022 data, annual power demand of Astypalea amounts to about 7GWh. Currently, only about 8% of the demand is covered by RES (solar energy) with the main load being served by diesel units. This implies a weighted average generation cost of about 523€ per MWh. Peak demand, observed during summer due to high tourism activity, lies around 3 MW.

“Astypalea Smart and Sustainable Island (ASSI)”, a breakthrough innovation project with the collaboration of the Municipality, the Greek state and Volkswagen Group was launched in 2020, envisaging full electrification of the island’s transport system, achieve a 100% decarbonization by 2050.

As part of this project, following a tender, the installation of a hybrid RES-station was awarded to PPCR in 2023. The project will be completed in 2 phases. In the first phase, a solar panel station of 3.5 MW coupled with 10 MWh batteries will cover 61,2% of the island's power demand.

The projects/activities with the highest potential under the 30 for 2030 call are:

  • Development of a Microgrid in Maltezana settlement

  • Full electrification of land transport, with V2G services

  • Development of smart marina, with 20 kW of PVs and batteries and electrification of touristic boats

 

Contact